Taylor Creative Logo
scroll
for more

osaka sofa white

the Osaka sofa designed in 1967 by Pierre Paulin. There are four configurations to choose from: straight, concave curve, convex curve, s-curve.

made in Italy

Quantity

6 pieces available

Dimensions

14' 2 1/2" (170.5") long x 31" deep x 26"high x 16 1/2"seat height

Special Notes

**taylor creative team to assemble only

Download 3d Model download 3d model

Video