Taylor Creative Logo
scroll
for more

osaka sofa black

the Osaka sofa designed in 1967 by Pierre Paulin. There are five configurations to choose from: straight, concave curve, convex curve, s-curve, double-curve (2 pieces)

$850.00
osaka sofa black

pricing is per piece, per 5-day rental period

Quantity

6 pieces available

Dimensions

14' 2 1/2" (170.5") long x 31" deep x 26"high x 16 1/2"seat height

Weight

320 lbs

Download 3d Model download 3d model

Color Options

  • white